Industrial construction

Industrial construction

Опыт

Rostar. Aluminum can manufacturing plant

Delivery period for this project was very short, in fact it took only 15 months to complete. STEP carried out the entire scope of design and planning works, executed production plant construction phase, renovated storage facilities, and performed landscaping on adjacent territory. Company installed all utility systems, constructed access roads to existing warehouses and production facilities from three different sides.

We build high-tech industrial complexes in various sectors

STEP has completed design and survey works, development of permits, general contract works for the construction of the complex Geropharm.

The high-tech pharmaceutical production plant includes production, administrative and utility rooms, as well as free-standing auxiliary building.

We provide a flexible approach to Customers’ requests

Cryoengineering production building Cryogenmash

This project called for construction of the new R&D and manufacturing facility. Acting as general contractor, STEP completed the whole range of tasks: earthwork and construction work, cranes and lifting mechanisms deployment, utility networks and communications installation, commissioning and start-up of all building servicing and supporting systems.

We undertake a full range of construction works

  • Source documentation gathering
  • Survey work
  • Project documentation preparation based on the basic engineering plan
  • Project professional expertise
  • Specification of equipment for purchase
  • Main process equipment procurement
  • Support equipment procurement
  • Component parts and materials in accordance with project documentation
  • Designed capacity achieved with guaranteed parameters
  • System configuration and set up
  • Linking and testing all technological elements
  • Maintenance service as per OEM instructions to ensure continued, trouble-free usage during the warranty period
  • Delivery and spare part replacement during the warranty period repairs and maintenance
  • Operation and maintenance manuals preparation and issuance
  • Site preparation
  • Foundation and substructure works for buildings construction and equipment mounting
  • Power cabling
  • Building construction
  • Equipment installation and mounting
  • Equipment hook-up
  • Turnover documentation